IRELAND · INFRASTRUCTURE

Infrastructure Ireland

Major developments in housing, transport, energy, water, public buildings and the infrastructure shaping Ireland’s future.

IRELAND NEWSPAPERIndependent editorial desk
EXPLORE

More sections

IRELAND NEWSPAPER · OFFICIAL OPEN DATA

Infrastructure Ireland Data

A combined official-data view of planning activity and national-road conditions.

OFFICIAL DATADepartment of Housing + Transport Infrastructure Ireland

Planning activity

40planning records in current API response

Carlow County Council

Carlow County Council

Permission to install a 0.51m x 1.42m x 1.8m (LxWxH) above ground enclosure to house a new natural gas district regulating installation with all ancillary services and associated site works

Carlow County Council

Carlow County Council

Planning permission for the construction of a single-story house, secondary effluent treatment system and all associated site works.

Carlow County Council

Carlow County Council

development consisting of the construction of a three storey square extension at the rear of the existing house, which is listed on the record of Protected Structures, the construction of a single storey link between the extension and the existing house and attendant site works

Carlow County Council

Carlow County Council

Permission for the removal of existing 14.8m flood light poles and associated light fixtures and there replacement with new 18.5 metre high flood lighting poles with new lighting fixtures on the training pitches 1and 2 to the rear of their sports facility

Carlow County Council

Carlow County Council

Permission for the change of use of premises from retail premises to a sit down and takeaway restaurant , new signage to front elevation and all associated site works

Carlow County Council

Carlow County Council

Retention planning permission to retain the refurbishment of a dwelling including increased roof height and addition of dormer windows and roof light to the front of the property

Carlow County Council

Carlow County Council

Permission to construct a dwelling house with on site effluent disposal system, bored well, new entrance, domestic garage and all associated site works

Carlow County Council

Carlow County Council

Retention of extension to the rear of the existing dwelling and permission for retention of domestic garage / store to the side of the existing dwelling and permission for retention of existing storage shed to the rear of the propoerty and all associated site works

Carlow County Council

Carlow County Council

Permission for the erection of a fully serviced dwelling house with domestic garage, septic tank, percolatation area, site entrance, bored well and all other associatated site works

Carlow County Council

Carlow County Council

to construct a new cow storage cubicle house and storage tank, new above ground slurry store, concrete aprons and all associated works to my existing farmyard area

Carlow County Council

Carlow County Council

Pl. 12/46 Extension Duration application for construction of a single storey dwelling, septic tank and percolation area and all associated site works

Carlow County Council

Carlow County Council

Permission to demolish a single storey structure to the north east elevation of existing dwelling and erect a new two storey extension to the north east elevation complete with all associated site works

Carlow County Council

Carlow County Council

Permission to erect milking parlour with collection area, slatted tank, dairy, powerhouse, race, crush, silo and all associated site works

Carlow County Council

Carlow County Council

Permission for the erection of a dwelling house and domestic garage / store with treatment system and soil polishing filter and all associated site works

Carlow County Council

Carlow County Council

Permission to construct (i) slatted shed incorporating straw bedding and handling area (ii) dung stead and all associated site works

National road travel times

100current values detected in TII feed

Publicationtime

2021-01-30T08:19:13+00:00

Measurementsitetablereference: TravelTimeSites · Measurementsitereference: ROI_ANPR_M1N.61-M1N.338 · Measurementtimedefault: 2021-01-30T08:19:04+00:00

Freeflowtraveltime

608

Normallyexpectedtraveltime: 698 · Measurementsitereference: ROI_ANPR_M1N.75-M1N.61 · Measurementtimedefault: 2021-01-30T08:19:04+00:00

Freeflowtraveltime

933

Normallyexpectedtraveltime: 983 · Measurementsitereference: ROI_ANPR_M1N.93-M1N.87 · Measurementtimedefault: 2021-01-30T08:19:04+00:00

Freeflowtraveltime

167

Normallyexpectedtraveltime: 182 · Measurementsitereference: ROI_ANPR_M1S.339-M1S.191 · Measurementtimedefault: 2021-01-30T08:19:04+00:00

Freeflowtraveltime

482

Normallyexpectedtraveltime: 490 · Measurementsitereference: ROI_ANPR_M1S.339-M1S.60 · Measurementtimedefault: 2021-01-30T08:19:04+00:00

Freeflowtraveltime

661

Normallyexpectedtraveltime: 680 · Measurementsitereference: ROI_ANPR_M1S.60-M1S.72 · Measurementtimedefault: 2021-01-30T08:19:04+00:00

Freeflowtraveltime

819

Normallyexpectedtraveltime: 922 · Measurementsitereference: ROI_ANPR_M1S.84-M1S.86 · Measurementtimedefault: 2021-01-30T08:19:04+00:00

Freeflowtraveltime

296

Normallyexpectedtraveltime: 306 · Measurementsitereference: ROI_ANPR_M1S.92-M1S.96 · Measurementtimedefault: 2021-01-30T08:19:04+00:00

Traveltime

96

Freeflowtraveltime: 96 · Normallyexpectedtraveltime: 97 · Measurementsitereference: ROI_ANPR_M50CITYBOUND.99-M50CITYBOUND.900

Measurementtimedefault

2021-01-30T08:19:04+00:00

Traveltime: 387 · Freeflowtraveltime: 304 · Normallyexpectedtraveltime: 390

Measurementsitereference

ROI_ANPR_M50N.37-M50N.33

Measurementtimedefault: 2021-01-30T08:19:04+00:00 · Traveltime: 217 · Freeflowtraveltime: 211

Normallyexpectedtraveltime

212

Measurementsitereference: ROI_ANPR_M50N.39-M50N.37 · Measurementtimedefault: 2021-01-30T08:19:04+00:00 · Freeflowtraveltime: 153

Normallyexpectedtraveltime

167

Measurementsitereference: ROI_ANPR_M50N.43-M50N.39 · Measurementtimedefault: 2021-01-30T08:19:04+00:00 · Freeflowtraveltime: 119

Normallyexpectedtraveltime

123

Measurementsitereference: ROI_ANPR_M50N.45-M50N.43 · Measurementtimedefault: 2021-01-30T08:19:04+00:00 · Freeflowtraveltime: 165

Normallyexpectedtraveltime

168

Measurementsitereference: ROI_ANPR_M50N.49-M50N.45 · Measurementtimedefault: 2021-01-30T08:19:04+00:00 · Freeflowtraveltime: 144